Real Labour productivity by NUTS 2 region in Centre — Val de Loire

Centre — Val de Loire: Real Labour productivity by NUTS 2 region was 105.4 in 2024. ▲ Rising

Latest (2024)
105.4
Change on year
up 0.3%
Rank
168th
of 304 regions
All-time high
106.4
in 2019
All-time low
95.4
in 2000
Years of data
25
2000–2024

Real Labour productivity by NUTS 2 region in Centre — Val de Loire, 2000–2024

02550751002000201220242000: 95.42001: 96.32002: 96.32003: 97.22004: 100.12005: 100.32006: 1022007: 103.32008: 100.32009: 992010: 1002011: 102.22012: 102.32013: 103.22014: 103.52015: 104.22016: 103.42017: 104.62018: 105.32019: 106.42020: 1002021: 103.52022: 101.42023: 105.12024: 105.4

Source: Eurostat.

Analysis

Centre — Val de Loire recorded 105.4 for real labour productivity by nuts 2 region in 2024.

Compared with earlier readings it is up 0.3% on the previous year and up 1.8% over ten years.

Over the whole period, real labour productivity by nuts 2 region in Centre — Val de Loire peaked at 106.4 in 2019 and was at its lowest, 95.4, in 2000.

That places Centre — Val de Loire 168th out of 304 regions with data for 2024, putting it in the middle of the range.

The long-run direction has been consistently rising across the 25 years of available data.

Averages by decade

DecadeAverage LowestHighest Years
2000s 99.02 95.4 103.3 10
2010s 103.51 100 106.4 10
2020s 103.08 100 105.4 5

More work & labour data for Centre — Val de Loire

All data for Centre — Val de Loire →

Frequently asked questions

What is real labour productivity by nuts 2 region in Centre — Val de Loire?
Real labour productivity by nuts 2 region in Centre — Val de Loire was 105.4 in 2024, according to Eurostat.
What is the highest real labour productivity by nuts 2 region recorded in Centre — Val de Loire?
The highest recorded value was 106.4 in 2019.
What is the lowest real labour productivity by nuts 2 region recorded in Centre — Val de Loire?
The lowest recorded value was 95.4 in 2000.
How does Centre — Val de Loire rank for real labour productivity by nuts 2 region?
Centre — Val de Loire ranks 168th out of 304 regions with data for 2024.
Is real labour productivity by nuts 2 region rising or falling in Centre — Val de Loire?
Over the last ten years it is up 1.8%. The long-run trend across the full record is rising.
Where does this Centre — Val de Loire data come from?
The figures come from Eurostat, published as part of Real Labour productivity by NUTS 2 region. Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 25 observations, free to reuse under CC BY 4.0 (Eurostat).

About this data

Indicator
Real Labour productivity by NUTS 2 region
Source
Eurostat
Licence
CC BY 4.0 (Eurostat)
Coverage
330 places, 8,185 data points, 2000–2024
Last refreshed